0345- Drain Pump Repaired and Protected

Industry: Water / Wastewater / Desalination
Problem: Corrosion / Erosion, Abrasion Resistance, Cavitation
Project Goal: To repair and protect a pump
Location: United States
Status: Completed
Project Description

MUNICIPAL STORM WATER DRAIN PUMP REPAIRED & PROTECTED WITH CERAMALLOY

 

Problem: Debris such as sticks, trash and silt eroded this municipal storm water drain pump bowl’s veins. The debris also broke the impeller’s veins.

Solution: A new ‘skeleton’ for the veins was constructed by welding metal bars and wire mesh. CeramAlloy CP+AC was used to rebuild the veins and CeramAlloy CL+AC protected all the internal pump surfaces.

Savings: A new pump has a 24 week lead time. The ENECON solution was completed in 1 week and provided over $50,000 in savings.